top of page

Mile Long Bridge Reconstruction

Illinois State Toll Highway Authority

Phase III engineering services are being performed for the construction inspection, and supervision on the Tri-State Tollway for all construction contracts associated with the Mile Long Bridge in Cook County, Illinois.

2IM Group is responsible for Construction Management services which involves conducting routine, pre-storm, storm event and post-storm SWPPP site inspections for sediment and water containment and implementation assistance. 2IM Group is also responsible for trouble-shooting site compliance and BMP issues as well as implementing BMP improvements in the field. Site/BMP issues and inspection results are communicated to drive improvements with construction and client personnel.

(312) 441-9554

118 South Clinton Street, Suite 350
Chicago, IL 60661

  • LinkedIn

©2024 by 2IM Group, LLC.

bottom of page